Coring Permit

General Information

 
 
 

Company Information

 
 
 
Multiple Emails With ;

Scanning/Coring Company Information

Structural Engineering Consultant Information

Aditional Information


* Choose from Checkboxes or fill out Other field
0 characters of 100 characters
Reason for Coring:
 
0 characters of 500 characters

Number
Number of Cores
Diameter (mm)
(F)loor,(W)all,(C)eilling
Depth (cm)
1
 
 
 
 
2
3
4










0 characters of 100 characters

  1. Download the Template
  2. Add your Drawings and Dimensions
  3. Upload your modified PDF
  4. Please look at the Example file if needed

File must be a PDF, and it cannot be larger than 15 MBs.
The total number of drawings should be the same as the total number of cores. All the drawings must be consolidated in to 1 PDF. Only 1 file can be uploaded.


File must be a PDF, and it cannot be larger than 15 MBs.
The total number of scans should be the same as the total number of cores. All the scans must be consolidated in to 1 PDF. Only 1 file can be uploaded.


 

Logistical Information

Requested Date of Shutdown:
2 weeks' notice required, 12 p.m. cutoff;
48 hours work period maximum, no work on weekends
 
 
Requested Times of Coring: Tell us hours you will work each day
24 hour clock MUST be used
 
0 characters of 300 characters

Consent